Our facilities

Construction of a 110 kV overhead line

Construction of a 110 kV overhead line

Installation of reinforced concrete foundations for anchor and angle tension towers

Assembly of intermediate metal supports for a 110 kV overhead line

Construction of a 110 kV substation

Construction of a pit for 110 kV overhead line supports

Installed 70-meter communication tower

Vertical erection of a communication tower

Installation of a lower section of a communication tower

Vertical erection of a communication tower

Installed 70-meter communication tower

Mounting antennas on a communication tower

Installation of a 70-meter communication tower

Installation of foundations for a 110 kV overhead line supports

Installation of foundations for a 110 kV overhead line supports

Installation of foundations for a 110 kV overhead line supports

Assembly of a 110 kV overhead line supports

Assembly of a 110 kV overhead line supports

Assembly of a 110 kV overhead line supports

Assembly of a 110 kV overhead line supports

Assembly of a 110 kV overhead line supports

Assembly of a 110 kV overhead line supports

Assembly of a 110 kV overhead line supports

Installation of wire, ground wire and optical cable on the 110 kV overhead line

Installation of wire, ground wire and optical cable on the 110 kV overhead line

Installation of wire, ground wire and optical cable on the 110 kV overhead line

Construction of a 110 kV substation

Construction of a 110 kV substation

Construction of a 110 kV substation

Construction of a 110 kV substation

Construction of a 110 kV substation

Construction of a 110 kV substation

Installation of 10-15 kV unit substations and 0.4 kV distribution boards

Installation of 10-15 kV unit substations and 0.4 kV distribution boards

Installation of 10-15 kV unit substations and 0.4 kV distribution boards

Installation of 10-15 kV unit substations and 0.4 kV distribution boards

Construction of a 0.4-15 kV overhead line

Construction of a 0.4-15 kV overhead line

Construction of a 0.4-15 kV overhead line

Construction of a 0.4-15 kV overhead line

Helicopter installation of supports

Helicopter installation of supports

Helicopter installation of supports

Illumination of custom 110 kV overhead line supports

Tesmec equipment with rope leader

Tesmec equipment with rope leader

Tesmec equipment with rope leader

Tesmec equipment with rope leader

A 15 kV cable reel on a hydraulic support

A 0.4 kV overhead line with cable lowering

Backfilling the trench with an excavator

Installation of cables along the walls and ceilings

A 10 kV cable line in a trench

Transition of an overhead power line into a 15 kV cable line

Wire/cable tension controller

Rollers

Rollers

Solar power station

A 0.4 kV distribution board on a support

A 0.4 kV distribution board on a support

Outdoor 0.4 kV distribution board

Outdoor 0.4 kV distribution board